1120 West Blanco
San Antonio, TX 78232
(210) 691-8444
Toll-Free (800) 448-8432
Fax (210) 561-9788

Last Revised on: 

Operator time is automatically tracked for each Task for each Job that they have worked on. The operator simply drags a Task from the Scheduled Tasks screen into the Open Tasks screen. Operators can also enter their time manually.

Material lists can be generated for each Job, allowing operators to "consume" Materials as they work.Time and Materials can be used to subtotal and populate the Billing Worksheet for the Job using estimated, actual, quoted values, or any combination to create a Billing Worksheet specific to your customer's needs.

The Open Tasks and Scheduled Tasks screens provide operators with all their work information. The Open Tasks screen allows an operator to charge time to a single Task or to multiple Jobs/Tasks.

Operators can view the Scheduled Tasks screen by Department names, by their own name, by statuses (which can provide Job routing flow), or by using the schedule filter to control how the schedules are displayed for them. By dragging a Task from the Scheduled Tasks screen on to the Open Tasks screen, time is automatically tracked for that Task.